• GPOC has been operating in Block 1, & 4S since 1996
  • Block 1 & 4S measures 18,6oo sq.km
  • Proposed relinquished area is about 9,193 sq.km while the retained area is 9,407 sq.km
  • GPOC Consortium Composed of
    1. CNPC – 40%
    2. PETRONAS – 30%
    3. ONGC – 25%
    4. NILEPET – 08%
  • PRODUCTION: 44.7 Kbd